| ITS Testing Forms Sign Off List |
Sr.
No. |
Testing Form Description |
Level |
Signoff Required |
Contractor |
ITS
Inspector |
TOC |
RE |
| 704.03.01 - General System (GS) |
1 |
Communication Cable |
|
√ |
√ |
|
√ |
| 704.03.02 - Camera Surveillance System (CSS) |
2 |
Camera Surveillance System |
Level A |
√ |
√ |
|
|
3 |
Camera Surveillance System |
Level B |
√ |
√ |
√ |
|
4 |
Camera Surveillance System |
Level C |
√ |
√ |
√ |
√ |
| 704.03.03 - Fiber Optic Cable |
5 |
Fiber Optic Cable |
Level 1 |
√ |
√ |
|
|
6 |
Fiber Optic Cable |
Level 2 |
√ |
√ |
|
√ |
7 |
Ethernet Communication System |
|
√ |
√ |
|
√ |
| 704.03.04 - Controlled Traffic Signal System (CTSS) |
8 |
Controlled Traffic Signal System (CTSS) |
Level A |
√ |
√ |
|
|
9 |
Controlled Traffic Signal System (CTSS) |
Level C |
√ |
√ |
√ |
√ |
| 704.03.05 - Travel Time System (TTS) |
10 |
Travel Time System (TTS) |
Level A |
√ |
√ |
|
|
11 |
Travel Time System (TTS) |
Level B |
√ |
√ |
√ |
|
12 |
Travel Time System (TTS) |
Level C |
√ |
√ |
√ |
√ |
| 704.03.06 - Road Weather Information System (RWIS) |
13 |
Road Weather Information System (RWIS) |
Level A |
√ |
√ |
|
|
14 |
Road Weather Information System (RWIS) |
Level B |
√ |
√ |
|
|
15 |
Road Weather Information System (RWIS) |
Level C |
√ |
√ |
|
√ |
| 704.03.07 - Dynamic Message System (DMS) |
16 |
Dynamic Message System (DMS) |
Level A |
√ |
√ |
|
|
17 |
Dynamic Message System (DMS) |
Level B |
√ |
√ |
√ |
|
18 |
Dynamic Message System (DMS) |
Level C |
√ |
√ |
√ |
√ |
| 704.03.08 - Weigh in Motion System (WIMS) |
19 |
Weigh in Motion System (WIMS) |
Level A |
√ |
√ |
|
|
20 |
Weigh in Motion System (WIMS) |
Level C |
√ |
√ |
|
√ |
| 704.03.09 - Traffic Volume System |
21 |
Traffic Volume System (TVS) |
Level A |
√ |
√ |
|
|
22 |
Traffic Volume System (TVS) |
Level C |
√ |
√ |
|
√ |