Refer to the following BDC Announcements for updates to the above Sections: (Updated as of 05/02/2012)
BDC12S-01
|
Revision to Subsection 101.04 of the 2007 Standard Specifications for Road and Bridge Construction |
| BDC12S-03 |
Revision to subpart 401.03.03 and Test Method R-1 of the 2007 Standard Specifications for Road and Bridge Construction. |
| BDC12S-06 |
Revision to Subsection 109.09, Subparts 155.03.01 and 156.03.01 of the 2007 Standard Specifications for Road and Bridge Construction |
| BDC11S-13 |
Revision to Subparts/Subsections 151.03.01, 152.03.01, 155.03.03 and 155.04 of the 2007 Standard Specifications for Road and Bridge Construction. |
| BDC11S-12 |
Revision to Subsections 651.04, 652.04 and 653.04 of the 2007 Standard Specifications |
BDC11S-10
|
Revision to the 2007 Standard Specifications, Subsections/Subparts of Division 100/150 (108.14, 155.03.01, 157.04, 158.03.02, and 159.04) have been revised to prevent the defaulted contractor from performing work as the Surety’s completion-contractor, updates Field Office equipment, corrects the Construction Layout payment formula, includes various Inlet structures categories, and includes Construction Sign measurement criteria. See the |
| BDC11S-08 |
Revision to the 2007 Standard Specifications, Subparts 401.03.05 has been revised to specify an application of tack coat for better HMA adherence. Subsection 902.03.03, 902.04.03, and 902.06.03, have been revised for increasing the lot size for sampling. Also, Subpart 903.05.04 is revised to eliminate testing for chloride permeability at 28 days. |
| BDC11S-07 |
Revision to the 2007 Standard Specifications, Subsection 160.03.01 has been revised to correct two typographical errors regarding Fuel Price Adjustment items. |
| BDC11S-06 |
Revision to the 2007 Standard Specifications, Subparts 607.03.02, 607.03.04, 610.03.04 have been revised to consolidate the text. Subsection 611.02 has been revised to provide the RE the authority to order moisture content testing of the sand used in the crush cushions. |
| BDC11S-05 |
Addition to the 2007 Standard Specifications, of new Subsection 107.17 regarding “Communication with the News Media”. |
| BDC11S-03 |
Revision to subsections 102.04, 505.03, 506.03, 509.03, and 554.04 of the 2007 Standard Specifications for Road and Bridge Construction |
| BDC11S-02 |
Revision to the 2007 Standard Specifications, Subpart 152.03.01 has been revised to remove the waiver of subrogation |
| BDC11S-01 |
Revision to the 2007 Standard Specifications, subsections 303.03, 401.02, 401.03, 402.01, 402.02, 402.04, 404.03, 902.02, 902.03, 902.04, 902.05, 902.06 and 1009.01 have been revised to correct minor errors, update and add some new specifications such as Asphalt-Rubber Open-Graded Friction Course (AROGFC) and High Performance Thin Overlay (HPTO). |
| BDC10S-12 |
Revision to the 2007 Standard Specifications, Subsections 105.07, 108.11, 152.04, 153.03, 155.03, and 157.03 have been revised |
| BDC10S-11 |
Revision to the 2007 Standard Specifications, Subsection 106.03 has been revised to require a certificaiton be submitted to verify compliance with the Buy America Laws |
| BDC10S-10 |
Revision to the 2007 Standard Specifications, Subsections 609.03, 609.04, and 913.01 have been revised to include payment for beam guide rail end treatment for cuts under the item Buried Guide Rail Terminal |
| BDC10S-09 |
Revision to the 2007 Standard Specifications, Subsections 152.03, 201.03, 507.03, 509.03, 905.01, & 1011.03 have been revised to require provision for the project specific Insurance policies. Subpart 201.03.04 has been revised to include the NJDEP requirements for the removal of underground storage tanks. Subparts 507.03.05, 507.03.06 and 509.03.01 have been revised to increase the concrete curing period. |
| BDC10S-08 |
Revision to the 2007 Standard Specifications, Sections 105, 106, 108, 159, 512, 701, 704, 918 and 1001 have been revised to update installation of Dynamic Message System Signs and other ITS related changes. |
| BDC10S-07 |
Revision to the 2007 Standard Specifications, Subsections 107.12 and 108.01 have been revised to include a refinement regarding claims committee review process and to provide a more accurate representation of the value of work subcontracted. |
| BDC10S-05 |
Revision to the 2007 Standard Specifications, Subsections 105.07, 153.03 and 157.03 have been revised to provide project information to the affected utility companies |
| BDC10S-04 |
Revision to the 2007 Standard Specifications, Subpart 156.03.05 has been revised to require calibration of nuclear density gauge every 24 months; and for the Contractor to supply a replacement gauge when the gauge is out for calibration and repairs. |
| BDC10S-03 |
Revision to the 2007 Standard Specifications, Subsection 901.11 has been revised to allow up to 30% Steel Slag to be added to Soil Aggregate I-14. |
| BDC10S-02 |
Revision to the 2007 Standard Specifications, Section 608 and Subsection 919.15 have been revised to include three additional non-vegetative surface items. |
| BDC10S-01 |
Revision to the 2007 Standard Specifications, Subsection 507.04 has been revised to include payment for epoxy coated reinforcement steel for the bridge approach under Concrete Bridge Approach |
| BDC09S-12 |
Revision to the 2007 Standard Specifications, Subsection 108.06 has been revised to eliminate the current color (orange) requirement for Class 3 safety vests. |
| BDC09S-11 |
Revision to the 2007 Standard Specifications, Subsections 508.02 & 508.04 have been revised to add fiberglass drainage pipe. |
| BDC09S-08 |
Revision to the 2007 Standard Specifications, Subsections 159.03.02, 609.03.01. 610.03.06 & 911.03 have been revised to specify mounting of flexible delineators on construction barrier curbs, along with dimension revisions. |
| BDC09S-07 |
Revision to the 2007 Standard Specifications, Subpart 160.03.01-1 has been revised to add Non-Vegetative Surface and Color-Coated Non-Vegetative Surface, Hot Mix Asphalt items to the list for the Fuel Price Adjustment. |
| BDC09S-06 |
Revision to the 2007 Standard Specifications, Subparts 912.03.01.B., 912.03.02, & 912.04.01 have been revised to set preliminary limits of heavy metal content in glass beads |
| BDC09S-05 |
Revision to the 2007 Standard Specifications, Subsection 102.03, has been revised that the bidders must acknowledge the receipt of all addenda posted |
| BDC09S-01 |
Revision to the 2007 Standard Specifications, Subsections 612.02, 612.03, 612.04, and 911.02 has been revised to specify the use of steel I-beam breakaway sign supports for large ground mounted signs |
| BDC08S-02 |
Revisions to various Subsections of the 2007 Standard Specifications and Standard Input. |
| BDC08S-01 |
Standard Inputs - Release of the 2007 Standard Inputs for the 2007 Standard Specifications |